Time-saving Pipe Support design – accessible to anyone

Pipe Support structures are typically quite simple. However, what they may lack in complexity they more than make up for in quantity. For the Anna Nery FPSO, Focus Techouse Engineering recently designed seven topside modules, with a total of more than 7000 pipe support structures. Thanks to Focus Pipe Support Calculation program (FPSC), most of this was handled by our Pipe Support design team, freeing up time for our Structural Department.

What can happen if we say: “Those instruments and lamps, we’ll just fix it later…”

Picture borrowed from amazon.com/bergen-industries-inc What can happen if we say: “Those instruments and lamps, we’ll just fix it later…”   Only people who have no EIT (Electro, Instrument, Telecom) knowledge can have this attitude, and it is a serious pitfall for all engineering projects. It can result in a major cost overrun, delay in planning…