Did you know that yearly about 14,000 bicycles are stolen in Norway? We hope our Clients will take action and put our ideas to the market! Our solutions for safer parking is stunningly flexible and are delivered in sheds with room for 2 bikes –  you can connect as many as you want. You can even build 2 floors, with a lifting system that makes the bike feels like 1 kg when lifting it to the second floor.

Read more

Working smarter by integrating stress and piping information in one 3D model!

Traditionally, pipe design and pipe stress are performed in two separate models. Ensuring that the two models are aligned is time-consuming.

Focus Techouse Engineering has made a tool to integrate design information between E3D and Caesar II, saving time, reducing the possibilities for errors, and freeing up the stress engineer to do actual stress design.

Read more

Superfast Pipe Support calculation – does it really exist?

For the Anna Nery FPSO, Focus Techouse Engineering recently designed seven topside modules, with a total of more than 7000 pipe support structures. Thanks to our calculation program, Focus Pipe Support Calculation (FPSC), all of the design and calculations were performed with a team of no more than 12 designers.

Read more

Why it is important for Electro Instrument & Telecom (EIT) engineers to be involved from the very beginning of an engineering project?

An engineering project is usually performed in 3 phases. The 3 phases are 30% – 60% and a 90% milestone reviews of the 3D model. These percentages (30% – 60%-90%) reflect a percentage of completed project, not a percentage of maturity of each discipline. For EIT’s part, we can say that we are usually about 30% finished when a 60% review is held, depending on how extensive the EIT contract is. So, what does this mean?

Read more

The dynamics of Electro Instrument & Telecom (EIT) in an engineering project

An engineering project is usually performed in 3 phases. The 3 phases are 30% – 60% and a 90% milestone reviews of the 3D model. These percentages (30% – 60%-90%) reflect a percentage of completed project, not a percentage of maturity of each discipline. For EIT’s part, we can say that we are usually about 30% finished when a 60% review is held, depending on how extensive the EIT contract is. So, what does this mean?