Material Handling Review (FTE Support to Black & Veatch)
Client: Black&Veatch
Year: 2024-2025
A Compressor Module feasibility study was conducted to evaluate the material handling capabilities of incorporating it into the available space. Planning considerations encompassed the periodic removal every five years of specific components, including the compressor casing, rotor, and the strategic planning required for replacing the gearbox and cooling system. Two optional lifting scenarios were explored: employing two 10-ton monorails for hoisting to the main deck through a hatch on the first floor or utilizing a single 10-ton monorail extended to another module with the addition of a removable stair.
Manifold Extension
A detailed constructability engineering for installing an extension of the HP and Test manifolds on MM2. Activities include budget quotations, 3D modelling, updating engineering documentation, risk analysis, piping stress calculations, ship stability reports, scheduling, and structural drawings. The project target is to connect three new risers with liquid flow rates of up to 5,000 BPD and gas flow rates of up to 5 MMSCFD to both HP Oil Production and Oil Production Test manifolds. Study partners include Focus Techhouse Engineering, Inocean, and DNV.
Budget hours from Yinson: 4500 (reimbursable contract with Yinson)
Spent hours: 4000
Cost approx.: $270 000,-
Client: Yinson
Owner: Yinson
Year: 2022
Project: FPSO JAK Manifold Extension Study
Focus Techouse Engineering – Services:
Client: Black&Veatch
Year: 2024-2025
Client: Höegh LNG
Year: 2024
Client: Techouse AS
Year: 2024
Client: Techouse AS
Year: 2023-2024
Client: Kongsberg Maritime
Year: 2023-2024
Client: Techouse AS
Year: 2023-2024
Client: Kanfa AS
Year: 2023
Client: Techouse AS
Year: 2023
Client: Yinson
Year: 2022-2023
Client: Kongsberg Maritime
Year: 2022-2023
Client: Yinson
Year: 2022
Client: Wärtsilä Oil & Gas Systems AS
Year: 2022
Client: Aragon AS
Year: 2020-2021
Client: Aragon AS
Year: 2020-2021
Client: Wärtsilä Oil & Gas Systems AS
Year: 2019-2020
Client: Kanfa AS
Year: 2019-2020
Client: Kanfa AS
Year: 2019 – 2020
Client: Wärtsilä Oil & Gas Systems AS
Year: 2019
Client: Wärtsilä Oil & Gas Systems AS
Year: 2018 – 2019
Client: Nexans Norway AS
Year: 2018
Client: Kongsberg Maritime AS
Year: 2017 – 2019
Client: Techouse AS
Year: 2017 – 2018
Client: Kanfa Ingenium Process AS
Year: 2017 – 2018
Client: Wärtsilä Oil & Gas Systems AS
Year: 2017 – 2018
Client: Wärtsilä Oil & Gas Systems AS
Year: 2017 – 2018
Client: Kanfa Ingenium Process (part of KANFA GROUP)
Year: 2015 – 2016
Client: Kongsberg Maritime Engineering
Year: 2015 – 2016
Client: Kongsberg Maritime Engineering
Year: 2015 – 2016
Client: Kongsberg Maritime Engineering
Year: 2014
Client: Nexans AS
Year: 2014 – 2015
Client: Kanfa (part of KANFA GROUP)
Year: 2014 – 2015
Client: Dana Petroleum / Sevan Marine
Year: 2011 – 2017
Client: Minox Technology
Year: 2015-2016
Client: National Oilwell Varco (NOV)
Year: 2014
Client: Nexans
Year: 2014
Client: Kongsberg Maritime Engineering AS
Year: 2012