SLMP Project

Project description

1 off reel ø12 m used for 700 m of 16.5” umbilical used on Statoil project. Total payload on reel with umbilical was approx. 450 mT. This reel was one of the largest in the market when we delivered it to our client. This was really a small beast!
National Oilwell Varco

Client: National Oilwell Varco (NOV)

Year: 2014

Project: 1000-SLMP project

Focus Cable Equipment – Delivery:

Do you need help with similar challenges?

Our latest Oil & Energy References