K-Walk Gangway Concept

Project description

Focus Engineering was involved in the initial concept phase of the project. After the concept phase was finished, Focus Engineering performed the global structural analyses for all relevant load conditions, as well as a number of different detail calculations. The K-walk gangway is designed and verified in accordance with DNVGL standards – Focus Engineering assisted the Client in the DNVGL approval process.

The video in the image gallery above is borrowed from our Client.

Client: Kongsberg Maritime AS

Year: 2017 – 2019

Project: P340 – Gangway Concept

Do you need help with similar challenges?

Our latest Oil & Energy References