FPSO Anna Nery (gas compression unit)
Client: Aragon AS
Year: 2020-2021
For all projects involving Focus Group, detailed plans are drawn up for all sub-deliveries. Combined with state-of-the-art computer infrastructure and tools, Focus Group is well equipped to undertake and carry out both small and large-scale projects from start to finish.
TRUSTWORTHY
The responsibility for project implementation for the individual projects in Focus Group lies with one of the subsidiaries Focus Construction, Focus Engineering or Focus Cable Equipment. Since these companies work together in a seamless way, they can draw on each other’s experience, expertise and services as needed. This way of working ensures efficient utilization of internal resources.
TRANSPARENT
Transparency is one of the company’s core values, hence why the company has opted for a project model that ensures full transparency about all matters surrounding the projects. We share all relevant project information with our clients. This method of working allows customers to feel confident that the projects are running to plan without having to worry about changes or unexpected surprises along the way.
PROFITABLE
Focus Group companies will solve the Clients’ challenges in a flexible way with just one point of contact, like a one-stop-shop. Our lean project management methods saves the Client valuable time and costs. The Focus Group is represented in several countries and benefits from prices in low-cost countries, such as Vietnam and China.
PROVIDENT
The tool that Focus Group uses in the information flow is a self-developed dashboard based on Smartsheet (smartsheet.com). The dashboard is continuously updated and works in real-time, hence, the live status of the project is visible throughout. In this way, Clients can follow the project’s development at any time by checking the project summary. They can also see areas of concern, or project conditions that may contribute to a layer of uncertainty. Such conditions can range from a lack of information needed to carry out the project, to consequences that may arise in connection with, for example, canceled flights in the event logistics operations are project-critical.
With this dynamic way of working, the Focus Group leads the way when it comes to proactive information sharing. Focus Group Clients do not need to ask for information about the project. The dashboard provides real-time access to all the information they need at any time.
Client: Aragon AS
Year: 2020-2021
Client: Aragon AS
Year: 2020-2021
Client: Smir AS
Year: 2020
Client: Wärtsilä Oil & Gas Systems AS
Year: 2019-2020
Client: Kanfa AS
Year: 2019-2020
Client: Kanfa AS
Year: 2019 – 2020
Client: Midt-Norsk Havbruk AS
Year: 2019
Client: Euroskilt AS
Year: 2018
Client: Midt-Norsk Havbruk AS
Year: 2019
Client: Wärtsilä Oil & Gas Systems AS
Year: 2019
Client: Wärtsilä Oil & Gas Systems AS
Year: 2018 – 2019
Client: Nexans Norway AS
Year: 2018
Client: Smir AS
Year: 2019
Client: Kongsberg Maritime AS
Year: 2017 – 2019
Client: Techouse AS
Year: 2017 – 2018
Client: Kanfa Ingenium Process AS
Year: 2017 – 2018
Client: Wärtsilä Oil & Gas Systems AS
Year: 2017 – 2018
Client: Wärtsilä Oil & Gas Systems AS
Year: 2017 – 2018
Client: Kanfa Ingenium Process (part of KANFA GROUP)
Year: 2015 – 2016
Client: Kongsberg Maritime Engineering
Year: 2015 – 2016
Client: Kongsberg Maritime Engineering
Year: 2015 – 2016
Client: Baggerød AS
Year: 2012 – Present
Client: Kongsberg Maritime Engineering
Year: 2014
Client: Nexans AS
Year: 2014 – 2015
Client: Kanfa (part of KANFA GROUP)
Year: 2014 – 2015
Client: Dana Petroleum / Sevan Marine
Year: 2011 – 2017
Client: Minox Technology
Year: 2015-2016
Client: National Oilwell Varco (NOV)
Year: 2014
Client: Nexans
Year: 2014
Client: Kongsberg Maritime Engineering AS
Year: 2012